Continue to Site »
Site will load in 15 seconds
Advertisment: Fluence » Fluence Order 95 » CBT ROS 970x250 Billboard Ad Nov 2025 » flu-dba-pythn-970-x-250

Groundbreaking Set for First Local Medical Marijuana Plant in Ohio

A ceremonial groundbreaking is set to happen on one of two medical marijuana cultivation facilities to be built in the Miami Valley.

Close Up Marijuana Leaf Dreamstime Credit Eric Limon Resized

A ceremonial groundbreaking is set to happen Thursday on one of two medical marijuana cultivation facilities to be built in the Miami Valley.

Cresco Labs Ohio LLC and officials with the village of Yellow Springs will be on hand at the site off East Enon Road near Antioch University, where a 23,294-square-foot steel greenhouse and a 26,445-square-foot processing facility will be built.

RELATED: UPDATE: Ohio Announces Provisional Licenses for 12 Level II Cultivators

The “environmentally sound greenhouse will be built for cultivating and harvesting condition-specific strains of medical marijuana and produce non-invasive medical products for qualified patients,” according to a release from Cresco Labs, which has similar facilities in Illinois, Pennsylvania and Puerto Rico.

Advertisment: Heat and Control » Heat and Control Order 114 » CBT ROS 300X250 Medium Rectangle Nov 2025 » hac-cannabis-business-times

Read more

Top image: © Eric Limon | Dreamstime.com

Advertisment: Heat and Control » Heat and Control Order 114 » CBT ROS 300X250 Medium Rectangle Nov 2025 » hac-cannabis-business-times
Advertisment: Heat and Control » Heat and Control Order 114 » CBT ROS 300X250 Medium Rectangle Nov 2025 » hac-cannabis-business-times
Page 1 of 39
Next Page
Advertisment: FundCanna » FundCanna Order 123 » CBT ROS 360x120 Mobile Adhesion November » mobile ad